
Decided to build out the ceiling next, so that I can start hanging pipes and belts from it.


Piping run out for the two main Heavy Oil Residue lines, one for Rubber, one for Plastic.
You must log in or # to comment.

Decided to build out the ceiling next, so that I can start hanging pipes and belts from it.


Piping run out for the two main Heavy Oil Residue lines, one for Rubber, one for Plastic.